Special and daily reports re roof construction

The request was partially successful.

Dear Pinelands Regional School District,

This is a request for public records made under OPRA and the common law right of access. I certify under penalty of NJSA 2C:28-3 that I have not been convicted of an indictable offense. Please acknowledge receipt of this message.

NOTE: This is a reminder of an existing request, sent originally on October 20th, and then clarified, as requested by Mr. Brennan, on October 28th (both were originally sent by email). Please consider this a reminder of the original request, not an entirely new one. Below is a repeat of the request as sent in email.

Thank you.

Jeff Epstein of Citizens’ Media TV

——

Records requested:

1. All special reports that are not already on the website.
2. All construction daily reports from July 15 to the present.
3. All field quality control daily reports from July 15 to the present.
4. All electronic and postal correspondence between the district and Epic Environmental starting on September 10th through October 15th.

The first three items are very specifically clarified below.

— SPECIAL REPORTS —

Special reports are specified in the contract under item 2.4.A and B in section 01310. Please provide all special reports in the district’s possession, that are not already available on the health-and-safety website.

Below is the full text from relevant section in the contract:

-----
2.4 SPECIAL REPORTS

A. General: Submit special reports directly to Owner within one day(s) of an occurrence. Distribute copies of report to parties affected by the occurrence.

B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise Owner in advance when these events are known or predictable.
-----

— DAILY REPORTS: TWO KINDS (field quality and construction) —

There are two kinds of daily reports specified in the contract. The first is under letter F in section 01300:

-----
F. Daily Construction Reports: The General Contractor shall prepare a daily report recording events at the site and submit copies to the Architect on a monthly basis or upon request.
-----

The second is under 3.10.A in section 07552:

-----
3.10 FIELD QUALITY CONTROL

A. The Contractor shall employ and pay for a qualified third party inspection agent for daily inspection work for this project, 5 clays per week minimum. A daily report shall be submitted to the Owner, Architect and Warranty manufacturer for their records.
-----

Dear Pinelands Regional School District,

This request was originally sent on October 20th, and clarified on October 28th at the request of Mr. Brennan. It should have been fulfilled by November 7th. Please provide an update on the status of this request.

Yours faithfully,

Jeff Epstein

***This request was already fulfilled, just a couple of days ago. Please just forward that same exact response to this email.***

FOLLOWUP-REMINDER of OPRA request originally submitted via OPRAmachine on 10/20/2017 and due 11/7/2017.
OPRA machine link for this request: https://opramachine.com/request/special_...
Below is a duplicate of the original request.
---
Dear Pinelands Regional School District,

This is a request for public records made under OPRA and the common law right of access. I certify under penalty of NJSA 2C:28-3 that I have not been convicted of an indictable offense. Please acknowledge receipt of this message.

NOTE: This is a reminder of an existing request, sent originally on October 20th, and then clarified, as requested by Mr. Brennan, on October 28th (both were originally sent by email). Please consider this a reminder of the original request, not an entirely new one. Below is a repeat of the request as sent in email.

Thank you.

Jeff Epstein of Citizens’ Media TV

——

Records requested:

1. All special reports that are not already on the website.
2. All construction daily reports from July 15 to the present.
3. All field quality control daily reports from July 15 to the present.
4. All electronic and postal correspondence between the district and Epic Environmental starting on September 10th through October 15th.

The first three items are very specifically clarified below.

— SPECIAL REPORTS —

Special reports are specified in the contract under item 2.4.A and B in section 01310. Please provide all special reports in the district’s possession, that are not already available on the health-and-safety website.

Below is the full text from relevant section in the contract:

-----
2.4 SPECIAL REPORTS

A. General: Submit special reports directly to Owner within one day(s) of an occurrence. Distribute copies of report to parties affected by the occurrence.

B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise Owner in advance when these events are known or predictable.
-----

— DAILY REPORTS: TWO KINDS (field quality and construction) —

There are two kinds of daily reports specified in the contract. The first is under letter F in section 01300:

-----
F. Daily Construction Reports: The General Contractor shall prepare a daily report recording events at the site and submit copies to the Architect on a monthly basis or upon request.
-----

The second is under 3.10.A in section 07552:

-----
3.10 FIELD QUALITY CONTROL

A. The Contractor shall employ and pay for a qualified third party inspection agent for daily inspection work for this project, 5 clays per week minimum. A daily report shall be submitted to the Owner, Architect and Warranty manufacturer for their records.
-----

Steve Brennan, Pinelands Regional School District

2 Attachments

Please see attached
Steve
STEPHEN J. BRENNAN, MBA, CPA
Business Administrator/Board Secretary
Pinelands Regional School District
520 Nugentown Road
Little Egg Harbor, NJ 08087
P-(609) 296-3106 x3282
F-(609) 294-9519

Dear Steve Brennan,

Special and daily reports. Got it. Thank you very much.

Yours sincerely,

Jeff Epstein